How to calculate monitoring storage capacity: comparison of resolution, bit rate and storage days

Release time:2026-08-15 00:00 Views:324 author:Xinlaida Security Technology Department source:technical knowledge
Provides practical calculation formulas and cheat sheets for storage capacity, and explains hard disk formatting loss, redundancy design, and practical selection recommendations.

Calculation formula

Single channel daily capacity (GB) ≈ bit rate (Mbps) ÷ 8 × 86400 seconds ÷ 1024 × 1.1

Dividing by 8 is to convert bit to Byte, and 1.1 is the additional overhead of the file system and index.

Simplified to facilitate mental arithmetic: Single channel per day (GB) ≈ bit rate (Mbps) × 11.6

Cheat sheet (single channel · saved for 30 days)

ResolutionBit rateEvery day30 days90 days
2 million2 MbpsAbout 23 GBAbout 0.7 TBAbout 2.0 TB
2 million4 MbpsAbout 46 GBAbout 1.4 TBAbout 4.1 TB
4 million4 MbpsAbout 46 GBAbout 1.4 TBAbout 4.1 TB
4 million6 MbpsAbout 70 GBAbout 2.0 TBAbout 6.1 TB
8 million8 MbpsAbout 93 GBAbout 2.7 TBAbout 8.1 TB

Estimation example

A certain project has 32 channels of 4 million cameras, a bit rate of 4Mbps, and is required to be saved for 30 days:

32 × 46 GB × 30 ≈ 44,160 GB ≈ 43 TB. Considering formatting loss and redundancy, it is recommended to configure 48 to 52 TB. For example, eight 8TB surveillance hard drives (approximately 64TB raw capacity).

Precautions for selection

  • Use a dedicated hard disk for monitoring: Supports 7×24 continuous writing. Ordinary desktop disks are prone to disk failure under multi-channel concurrent writing.
  • Leave redundancy: The actual capacity used is not recommended to exceed 85% of the total capacity to avoid fragmentation and write failures.
  • Formatting loss:There is a difference of about 7% to 10% between the nominal capacity of the hard drive and the actual available capacity.
  • Double backup of important channels: NVR dual-disk hot backup or separate storage of key channels can be used.
  • Tiering on demand: 90 days for key areas and 30 days for ordinary areas, which can significantly reduce the overall cost.