Monitoring system routine maintenance checklist

Release time:2026-06-06 00:00 Views:246 author:Xinlaida Security Technology Department source:technical knowledge
An executable inspection list is provided by day, week, month, and quarter to eliminate faults before they occur and extend the life of the system.

Daily

  • Spot check the real-time images of key channels to confirm that the images are normal and unobstructed.
  • View system alarms (offline, hard disk abnormalities, capacity alarms).
  • Confirm that the video is being written normally.

Weekly

  • Playback spot check: Randomly check at least 1 channel in each partition to confirm that the video is complete and the time is accurate.
  • Check the remaining storage capacity and the estimated number of days it can be stored.
  • Check the online rate of equipment and process offline points.
  • View the hard drive SMART status.

Monthly

  • Clean the camera lens and protective cover (especially outdoors, in the kitchen, and in dusty environments).
  • Check the fastening and corrosion of brackets, poles, and equipment boxes.
  • Check whether the outdoor joint waterproofing is intact.
  • Check the system time (the deviation from the NTP server should be < 1 second).
  • Export and archive important event recordings.
  • Check UPS battery status.

Quarterly

  • Check the lightning arrester and grounding resistance (must be done before thunderstorm season).
  • Clean equipment boxes, fans, and dust screens to improve heat dissipation.
  • Check switch port status and error count.
  • Recheck account permissions and clean up the accounts of resigned personnel.
  • Update device firmware (verify at non-critical points first).
  • Check whether the point ledger is consistent with the actual situation.

Every year

  • Comprehensive assessment of whether storage capacity will meet demand for the next year.
  • Evaluate the life of the hard disk (monitoring disks are recommended for preventive replacement every 3 to 5 years).
  • Check whether the vertical pole foundation has settled or tilted.
  • Review the lightning protection grounding system.
  • Practice a fault recovery process and verify that the backup is available.
  • Update as-built drawings and location ledgers.

Recommended records

  • Point ledger: number, location, model, IP, coverage, installation date.
  • Device list: model, serial number, firmware version, warranty period.
  • Network planning: IP allocation table, VLAN, port correspondence.
  • Maintenance records: time, reasons, and results of each inspection and troubleshooting.
  • Account list: users, permissions, activation and cancellation time.