Monitoring project acceptance key points and completion data list
Provide a systematic acceptance checklist and a list of materials that should be handed over to avoid disputes due to missing data after delivery.
Acceptance Checklist
Equipment installation
- The number and location of points are consistent with the design plan (check point by point).
- The installation is firm, the brackets and poles do not shake; the outdoor equipment is waterproofed in place.
- The lens is clean, the picture is unobstructed, and the angle meets the design requirements.
- Cables are clearly marked, strong and weak currents are separated, and wiring is standardized.
- Grounding and lightning protection meet requirements and have test records.
Image quality
- The resolution and frame rate reach the design values.
- Key areas (faces, license plates, cash registers) can be clearly identified, and screenshots can be saved.
- Check backlight and night scenes separately to confirm the wide dynamic/night vision effect.
- No horizontal stripe interference, color cast, blur and other problems.
System functions
- Real-time preview, multi-screen, and patrol are normal.
- The recording plan covers the whole day, and playback and retrieval are convenient.
- The storage capacity meets the storage days requirements and has a margin.
- Time synchronization is accurate (network-wide deviation ≤ 1 second).
- Alarm linkage, motion detection, and intelligent analysis work as designed.
- Remote access (client/mobile) available.
- The splicing screen is installed on the wall and the plan patrol is normal.
Stability
- Run continuously for 72 hours without any abnormality.
- The device online rate is 100%.
- No flickering, disconnection, or missing video.
- The hard disk status is normal and there are no bad sector alarms.
Completion information list
- As-built drawings: site layout diagram, system topology diagram, network structure diagram, cabinet layout diagram.
- Point ledger: number, location, model, IP, coverage area, installation date.
- Device list: model, quantity, serial number, firmware version, warranty information.
- IP and port comparison table: IP ↔ MAC ↔ switch port ↔ location.
- Test records: network test, ground resistance test, image effect screenshots (including night vision).
- Configuration Document: Key configuration instructions for NVR/switch/camera.
- Account list: Description of each system administrator account and permissions.
- Operation manual: daily operations, playback, export, common troubleshooting.
- Training records: training content, participants, sign-in sheet.
- Acceptance report: signed and confirmed by both parties.
Training Points
- Administrator: configuration, account, storage, backup, upgrade.
- Operator: preview, playback, export, alarm handling.
- Provide written operation manuals and quick operation cards.
- Clear the channels for reporting repairs and the response time limit.
Items that are easy to miss
- The administrator account and password have not been transferred (or the password is still the default value).
- There is no IP and port comparison table, making it difficult to troubleshoot later.
- No ground resistance test records were made.
- No screenshots of the night effect were retained, and there is no basis for subsequent disputes.
- The warranty scope and response time limit are not specified.
Related content
Linkage integration of video surveillance, access control, and alarm systems: interface methods and implementation points
09-19
Moiré and false color in surveillance images: lens and sensor matching issues
09-18
Progressive transformation from analog to network: reusing coaxial and hybrid networking solutions
09-17
Lens dirt and protective window cleaning: invisible causes of image quality degradation
09-16
Surveillance video as evidence: retrieval process, preservation and legal effect
09-15
Permission classification and desensitization of video data: who can watch and who can export
09-14
Security system level protection: What requirements should the video surveillance part meet?
09-13
Computer room dynamic environment monitoring: temperature and humidity, mains power, water leakage and smoke detector access
09-12
