Point planning method for factory/park monitoring system

Release time:2026-05-25 00:00 Views:420 author:Xinlaida Security Technology Department source:technical knowledge
According to the six parts of perimeter, entrance and exit, roads, workshops, warehouses and key areas, the planning points of industrial park monitoring are explained.

1. Perimeter

  • Physical fence: 1 infrared security camera every 40 to 60 meters, humanoid detection and filtering of small animals.
  • No wall or fence perimeter: dense distribution or use of electronic fence + video review.
  • Key considerations: areas close to rivers, villages, and areas with climbing objects.
  • Coordinate with sound and light alarms and broadcast announcements.

2. Entrance and exit

  • Truck passage: license plate recognition + barrier gate + weighbridge, equipped with fill light (special machine for license plate recognition).
  • Personnel channel: Face/card swipe gate, connected to the attendance system.
  • Configure 1 panoramic camera to record the overall situation of vehicles and personnel.
  • Consider the separation of people and vehicles to avoid mixed traffic.

3. Park roads

  • One station every 30 to 50 meters on the main road, and must be installed at intersections.
  • Focus on coverage of blind spots, curves, and reversing areas.
  • Must be installed at the intersection of forklift passage and pedestrian passage.
  • A ball machine can be used for cruising.

4. Production workshop

  • The main passages, entrances and exits are fully covered, and the workstation area is determined according to management needs.
  • Hazardous chemicals area, high temperature and high pressure area: set up intrusion detection and sound and light alarm.
  • Select IP66/IP67 and anti-corrosion equipment for dusty and corrosive environments.
  • Optional: safety helmet/workwear identification, off-duty detection.

5. Warehouse and Logistics

  • The entrance and exit of the warehouse must be set up to record the flow of materials.
  • The shelf aisles are arranged at intervals of 15 to 25 meters, and attention is paid to the obstruction of high-rise shelves.
  • Separately arrange high-value material areas and extend the video storage period.
  • Platform/loading and unloading area: The entire process is videotaped, and cargo damage disputes can be traced.

6. Key areas

  • Financial room, computer room, hazardous chemicals warehouse, power distribution room: independent storage + stricter permissions.
  • Monitoring center: covering operation console and access control.
  • Canteen/restaurant: can be connected to a bright kitchen and a bright stove.

Design points

  1. First outPoint map: Mark each point, coverage, and focal length on the floor plan.
  2. On-site survey and confirmation: shielding, power acquisition, network access, and pole position.
  3. Tiered design: which areas are 90 days and which are 30 days.
  4. Reserve 15% to 20% point margin to facilitate later expansion.
  5. Coordinate and consider linkage with access control, alarm, fire protection, and broadcasting systems.

Common Omissions

  • Only cover the interior, ignoring the perimeter and roof.
  • Shelves high in the warehouse form a large blind area.
  • The loading dock does not have a separate forensic camera.
  • Night lighting was not considered, resulting in a large number of points failing at night.
  • There is no channel or power supply reserved for maintenance.