Smart construction site safety management and control project for a construction group
Covering the tower crane working surface, the periphery of the foundation pit, the material storage yard and the workers' living area, the wireless network can be used to relocate the points as the project progresses, and cooperate with safety helmet identification and cross-border alarms.
Project Overview
Project basic information
project site
Real scene of project site
Project background
This project is an urban renewal complex project, which is being promoted simultaneously in three bidding sections. There are about 1,200 laborers on site during the peak period. The project department hopes to effectively reduce on-site safety risks while meeting the "Smart Construction Site" filing requirements of the housing and construction authorities.
Design for migration as progress
The difficulty with construction sites is that "the best spot today may not exist next month". Plan adopted:
- The points are all installed on removable movable poles with counterweights at the bottom, eliminating the need for expansion bolts.
- Video backhaul is mainly based on wireless bridges, and only wired ones are reserved in permanent buildings.
- Every time the image progress changes, we and the project department will jointly review the point ledger.
Actual value
- Border crossing warnings are issued an average of 6-8 corrective reminders per day, and the violation rate decreases month by month after forming a habit.
- The number of night theft incidents in the materials yard dropped from an average of 3 incidents per month to 0 incidents.
- The labor real-name system is linked with the face turnstile, and settlement disputes at the end of the month are significantly reduced.
Project difficulties
Issues that need to be addressed during project advancement
The construction surface of the construction site changes rapidly, and points need to be moved frequently
Traditional wired points cannot be moved once pouring is completed
The working surface of the tower crane has a wide view but difficult wiring
High points lack mains power and network access conditions
The labor force is highly mobile and the real-name system is difficult to manage
It is difficult for the personnel entering the site to correspond to the video screen
Foundation pits and edges are high-risk areas
Nighttime operations take a long time and manual supervision is difficult
solution
Technical and construction measures taken to address the above difficulties
Adopting detachable pole + wireless bridge network
The point is moved as a whole according to the progress of the image, and the average migration takes 2 hours
Deploying 4G/5G wireless dome cameras at the commanding heights
covering the panoramic view of the foundation pit and tower crane rotation radius, supporting automatic cruise
Facial recognition in living areas and turnstiles
Labor real-name data is bound to traffic records, and attendance and screen can be checked in both directions
Electronic fence cross-border alarm in the border area
Personnel approaching the edge of the foundation pit triggers a broadcast and pushes the safety officer
Project results
Actual operating data after the system goes online
Main equipment list
This project mainly uses equipment (XLD is mainly self-developed)
- Wireless Bridge — 24 pairs, point-to-multipoint backhaul
- 4G/5G wireless ball machines — 12 units, panoramic view from the commanding heights
- 2 million network gun machines — 62 units, foundation pit and material area
- Face recognition channel gate — 6 channels, real-name linkage
- AI edge analysis box — 3 units, hard hat/cross-border identification