Chemical industry Chemical Industry Park in a city in North China 2020-09 18

Safety production video networking project of a chemical group company

Comply with the deployment of explosion-proof certification equipment in explosion-proof areas, and achieve unified supervision of major hazard sources, linkage of work tickets and identification of safety violations through the video networking center.

  1. front page
  2. Project cases
  3. Safety production video networking project of a chemical group company

Project Overview

Project basic information

Project customersA chemical group company
Project locationChemical Industry Park in a city in North China
Project scale3 factory areas/9 major hazard sources/460 road points
Project duration85 days
Delivery time2020-09
ClassificationChemical industry

project site

Real scene of project site

Project background

The group's three factories contain nine major hazard sources. As regulatory authorities place more emphasis on hazardous chemicals companies As the requirements for online monitoring of "Two Key Points and One Major" continue to increase, the group decided to build a unified video surveillance network.

Key points for explosion-proof compliance

  1. All equipment entering the explosion-proof area must pass the explosion-proof certification of the nationally designated agency, and the nameplate and number must be verified on-site.
  2. The shield, junction box, flexible pipe, and gland must form a complete explosion-proof link. If any link is not compliant, the entire system will fail.
  3. Construction personnel must pass the factory safety education assessment and be accompanied by gas detection during the entire operation.
  4. All wiring holes are sealed with explosion-proof sealing putty, and the sealing rate is 100% accepted.

Manage value

After the online platform is launched, the Group's Safety and Environmental Protection Department can view the status of hazard sources in each factory area in real time. The time required to prepare materials for safety inspections at all levels has been reduced by about 80%, and the violation rate of hot work has been significantly reduced.

Project difficulties

Issues that need to be addressed during project advancement

Explosion-proof areas have mandatory requirements for equipment and construction

Equipment that has not passed explosion-proof certification is strictly prohibited.

It is difficult to supervise hot work and confined space work

There is a lack of visual evidence for the execution of work tickets

Data in multiple factory areas is scattered, making it difficult for the group to conduct unified supervision

Lack of an integrated online platform

The entry and exit of hazardous chemical vehicles must be fully managed

there are risks in loading, unloading and driving in the factory

solution

Technical and construction measures taken to address the above difficulties

All explosion-proof areas use Ex d IIB T6 certified equipment

including shields, junction boxes and flexible pipes with full link compliance

The mobile control ball in the hot work area is linked to the work ticket

After the work ticket is approved, the corresponding screen recording will be automatically started

Networking of three factories + group-level supervision platform

supports electronic map, hazard source ledger and video linkage

Monitoring of dedicated passages and parking areas for hazardous vehicles

identification of license plates and tank markings, automatic alarms when limits are exceeded

Project results

Actual operating data after the system goes online

100%
Video network coverage of major hazard sources
9 Departments
Online supervision of dangerous sources
80%
Safety management inspection preparation time reduced
0
Construction safety accidents in explosion-proof areas

Main equipment list

This project mainly uses equipment (XLD is mainly self-developed)

  • Explosion-proof certified network gun machine186 units, explosion-proof area
  • Explosion-proof and explosion-proof pan/tilt24 units, tank area and installation area
  • Ordinary 2 million network gun machine250 units, non-explosion-proof area
  • Explosion-proof junction box and flexible pipeMatched according to national standards
  • Group networking platform3 factory cascades, electronic map